XYX-200 Wheel Hydraulic Core Drilling Machine Trailer Type 200m Engineering Exploration Surface Rock and Soil Sampling

1 Set
MOQ
XYX-200 Wheel Hydraulic Core Drilling Machine Trailer Type 200m Engineering Exploration Surface Rock and Soil Sampling
Features Gallery Product Description Request A Quote
Features
Specifications
Model NO.: XYX-200
Motor: Diesel Engine
Drill Hole Diameter: 76-200mm
Drill Hole Depth: 200m
Usage: Water Well, Geotechnical Investigation
After-Sales Service Provided: Video Technical Support
Highlight:

diesel engine hydraulic drilling machine

,

diesel engine hydraulic core drilling machine

Basic Infomation
Place of Origin: Hebei,China
Brand Name: Aoxing
Certification: ISO9001
Model Number: XYX-200 type
Payment & Shipping Terms
Packaging Details: in New Strong Plywood Case
Supply Ability: 50 Sets/Month
Product Description

XYX-200 Wheel Hydraulic Core Drilling Machine Trailer Type 200m Engineering Exploration Surface Rock and Soil Sampling

 

1. Characteristics of XYX-200 wheeled hydraulic core drilling rig

Hydraulic cylinder, high efficiency.

Wheeled walking mechanism, very convenient for transport and adjusting the drilling rig level.

Pressure gauge display the condition of the bottom of the drill hole.

The drilling rig is equipped with a ball card holding mechanism instead of chuck, and it can be operated without stopping the rod.

The working efficiency is high and the operation is convenient, safe and reliable.

2. Technical parameters of XYX-200 wheeled hydraulic core drilling rig

Model XYX-200
Drill hole depth 200m
Maximum opening diameter 300mm
Final hole diameter 75mm
Drill pipe diameter 60mm
Borehole inclination 90°-75°
Rig weight (without power) 1300kg
Trigonometric belt B950*4 B1700*3
Active moving distance 300mm
Power Diesel engine/motor 22hp/16.2kw
Spindle
Shaft rotation speed 64/128/ 287/ 557 r/min
Vertical axis stroke 450mm
Windlass
Maximum lifting weight of single rope 2400kg
Single rope lifting speed 0.41/ 0.82/1.64m/s
Wire rope diameter 13mm
Wire rope capacity 35m
Hug floodgate caliber 260mm
Hug floodgate belt width 70mm
Mud pump
Type Horizontal single cylinder double action
Maximum displacement

Diesel engine 170L/min

Matching motor 150L/min

Maximum pressure 3Mpa
Work pressure 1.5Mpa
Inlet pipe caliber 40mm
Outlet pipe caliber 30mm
Triangle conveyer belt B1728mm
Type CBT-F-314
Triangle conveyer belt B1100*1

Note: The product is continuously improved, and subject to change without notice, please refer to the actual product.

 

XYX-200 Wheel Hydraulic Core Drilling Machine Trailer Type 200m Engineering Exploration Surface Rock and Soil Sampling 0XYX-200 Wheel Hydraulic Core Drilling Machine Trailer Type 200m Engineering Exploration Surface Rock and Soil Sampling 1XYX-200 Wheel Hydraulic Core Drilling Machine Trailer Type 200m Engineering Exploration Surface Rock and Soil Sampling 2XYX-200 Wheel Hydraulic Core Drilling Machine Trailer Type 200m Engineering Exploration Surface Rock and Soil Sampling 3

 

Drilling rig safety technical measures
① The on-site drilling rig must be operated with a certificate, labeled as responsible, and assigned to a specific machine and person;
② Keep the mechanical equipment neat and intact, free of old oil stains, ropes free of rust and turbidity, and wear controlled within the standard range
Within the specified range, the gears and their meshing areas are well lubricated;
③ The rotating parts of the drilling rig must have safety protection devices, and the gearbox and its components must be inspected before drilling
Is the mechanical transmission part sensitive, safe, and reliable? When starting, it is important to carefully observe the surrounding environment of the machine,
Call first and then push the brake;
④ Employees are prohibited from entering the construction site without wearing a safety helmet, slippers, or bare chested, and must be at least three meters tall
Empty homework must wear a safety helmet;
⑤ There must be protective devices or obvious signs at the ditches, pits, and other places on the construction site, and protective hole pipes must be buried properly
After that, it is necessary to cover or set up warning lines, and protective railings should be set up in the mud pit;
⑥ Before construction, it is necessary to first understand the relevant underground structures and underground power, water, and gas pipelines
Take timely protective measures in accordance with relevant national regulations regarding the situation;
⑦ Construction near overhead transmission lines must strictly follow the relevant regulations of safety operation procedures
During construction, cranes and other equipment should not be stacked directly below the high-voltage line. There should be a gap between the drilling rig and the high-voltage line
Reliable safety distance;
⑧ Nighttime construction requires sufficient lighting equipment, drilling rig operation platform, transmission and turntable, and other hazards
There should be no black shadows left in the main channels of the area;
⑨ The captain, squad leader, and safety officer of the drilling rig must personally command the movement of the rig, and must be on duty every day
Inspect labor supplies, mechanical equipment and tools, lifting equipment, rigging, etc. at the end of the workday to ensure their proper use
Carry out construction in good condition, eliminate hidden dangers, and ensure safe construction.

Recommended Products
Get in touch with us
Tel : +86-15132806565
Fax : Hengshui Aoxing Metal Products C
Characters Remaining(20/3000)