150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig

1 Set
MOQ
150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig
Features Gallery Product Description Request A Quote
Features
Specifications
Model NO.: XY-150Type
Condition: New
Motor: Diesel Engine
Drill Hole Diameter: 46-300mm
Drill Hole Depth: 150m
Bit Type: Diamond Bit
Drilling Way: Rotary
Usage: Geotechnical, Soil Test, Water Well
Diesel Engine: Changchai Zs1105
Highlight:

diamond bit core drilling rig

,

diesel engine core drilling rig

,

diamond bit crawler drilling rig

Basic Infomation
Place of Origin: Hebei,China
Brand Name: Aoxing
Certification: ISO9001
Model Number: XY-150 type
Payment & Shipping Terms
Packaging Details: in Plywood Case
Supply Ability: 30 Sets/Month
Product Description

150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig

 

XY-150 is a portable and multipurpose engineering exploration drilling rig, applicable to the engineering geological exploration in fields of industrial and civil buildings, railways, bridges, hydropower engineering, as well as small-diameter foundation pile hole drilling.

1. Large torque, multiple drilling speeds in an appropriate range.


2. With 2-wheels trailer, the rig can be moved by towing the trailer.
3. Capable to drill inclined holes at different angle.
4. High efficiency drilling with hydraulic feeding structure.
5. Multiple usages, geotechnical investigation for engineering constructions, SPT soil test, mineral exploration, small size pile hole, water well boring.

 

 

The technical parameter of the XY-150T Drilling Rig:

Basic Parameters
Drilling depth 45-180m
Drilling diameter 300-76mm
Drill pipe diameter 42mm 50mm AW BW AWJ BWJ
Gross weight of drilling machine(engine not included) 500kg
Dimension (length ×width × height) 2050 × 1180× 1420 mm
Revolving Plate
Rated speed 60 200 400 610 1100 r/min
Maximum torque 1800N*m
Driving travel 450mm
Maximum Cylinder driving force 20KN
Maximum Cylinder lifting force 30KN
Lifter
Lifting capacity 24KN
Bobbin line speed (2 layers) 0.20 0.72 1.26 2.8 m/s
Bobbin diameter 125mm
Rope diameter 11mm
Rope capacity 26m
Oil pumps:  
Displacement: 20ml/r
Normal speed 2500r/min
Normal pressure 20MPa
Max pressure 25MPa
Drive motor
Type Changchai ZS1105 diesel engine
Rated power 13.2KW
Rated speed 2200r/min
weight 163kg
Frame
Type Sliding type(with base frame)
Movable travel of drill 400m
Distance between drill and hole-opening 280mm

150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig 0150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig 1150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig 2

 

150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig 3150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig 3150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig 5150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig 6150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig 7150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig 8150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig 5150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig 6150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig 11150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig 7

 

Safety hazards of drilling rigs
1. When conducting standard penetration tests, the operator must keep their hands away from the probe when the centrifugal hammer falls freely to prevent the probe from falling off and injuring the operator.
2. When the drilling rig is in operation, on-site personnel must wear safety helmets and personnel unrelated to the operation must not approach the drilling rig to prevent the top fasteners of the drilling rig tower from falling and injuring them.
3. During the operation of the drilling rig, always pay attention to the mud pump behind the rig. If the mud pipe ruptures or the drill pipe is blocked during high-pressure operation, it may cause mud spraying and injure on-site personnel.
4. Before starting work, it is necessary to check whether there are any safety hazards in the steel wire rope on the winch and the fasteners of the elevator, in order to prevent the steel wire from breaking and the fasteners from falling off when lifting the probe rod, which may harm the on-site operators.

Recommended Products
Get in touch with us
Tel : +86-15132806565
Fax : Hengshui Aoxing Metal Products C
Characters Remaining(20/3000)